Internal demo — content for team review · not the live site

Materials path

Send fiber and resin. Get a roll you can test. Then decide whether to own the line.

CDI, a leading global supplier of prepreg machines and specialist composite processing equipment, runs the same process on toll that it sells as a CD6019.

  1. 01 Send the chemistry

    Fiber and matrix. Development quantities. 500 g of matrix is enough to start.

  2. 02 Run it on the process that would ship

    Impregnate, form, wind. Same dies, same recipe logic as in-house.

  3. 03 Take the roll. Keep or install

    Unused matrix is returned. If the recipe holds, the next step is a CD6019 or an OnDemand module — not a new invention.

Formats

Four ways the material shows up.

Format What it is Edge Wind Backer Best fit
ShapedTape Narrow tape at final width Formed. No cut edges, half-tows, or fuzz Parallel Poly film AFP / ATL drop-in for slit tape
Precision tow Impregnated tow, higher speed Medium dimensional control Parallel Poly film Winding and lower-cost AFP/ATL
Towpreg Impregnated tow, no paper Lower dimensional control Traverse None Filament winding, pultrusion
Narrow tape prepreg Toll on a CD6019-class line Formed or specified with the order As specified As specified The format that most often becomes an in-house line
14 weeks traditional lead time15 min power-on15 min die change1 lb of tape in 6 minutes500 g in / 1 lb usable / 30 g residue10 ft × 4 ft per module

Bridge

Toll is not a dead end.

The roll is made on the process a shop would buy.